Phone: (08) 6305 0381   Email: info@reillycontractors.com.au

Text Size: Resize Text Up Resize Text Down

Amberton

Project Location: Amberton Client: RJ Vincent
Value: $1m>$2m Project Timeline: 2013/14/15

The Amberton project was started in June 2013. Reilly Contractors is responsible for the excavation and installation of underground services including sewer, stormwater, water reticulation, irrigation, gas, power and the NBN.

As with the other subdivisions we have done in this area (Shorehaven), we have found our biggest challenge to be excavating the harder rock types. The use of the Erkat Rock Wheel has allowed us to achieve exceptional compressive strength  which then allows us to increase our excavation rate through these harder rock types. As we were excavating in rock, sand had to be mined from an area adjacent to the stage and carted into each trench to be used for bedding and surround.

Between 2013-2015, we completed Stages 5, 6, 7A, 7N, 14A, 14B, 13A, 13B, 15, 16, 17, 18, 19, 20A and 24. 


View all Projects

View All

Latest News

  • 20/08/18Good luck, Kat! Mike, Liz and the team would like to wish our HESQ Manager, Katherine Connolly, good luck as she heads off on Maternity Leave.   ...
  • 31/05/18Come join us! Come and join the team at REIPLANT WA. We are actively seeking a suitably experienced Fitter / Mechanic to work as part of our team. Responsible...

Subscribe to updates

Contact Reilly Contractors on
(08) 6305 0381 or e-mail: info@reillycontractors.com.au